- Overview
- Product Description
- Product Parameters
- Discharge Characteristics
- Installation Cases
- Certifications
- Packaging & Shipping
Basic Info.
Product Description
Key Features:
*Gelled electrolyte made by mixing sulfuric acid with silica fume.*High rate discharge performance due to tight assembly
technology
*Strong heat dissipation and wide operating temperature range
*Avoid acid mist being separated out , environment friendliness
*Efficient venting system release excessive gas automatically
Applications:
*EPS and UPS battery backup
*Solar and wind energy storage system
*Telecommunication Equipment
*Power plant and transmission system
*Signal system , emergency lighting system , security system
Key Features:
*Gelled electrolyte made by mixing sulfuric acid with silica fume.*High rate discharge performance due to tight assembly
technology
*Strong heat dissipation and wide operating temperature range
*Avoid acid mist being separated out , environment friendliness
*Efficient venting system release excessive gas automatically
Applications:
*EPS and UPS battery backup
*Solar and wind energy storage system
*Telecommunication Equipment
*Power plant and transmission system
*Signal system , emergency lighting system , security system
1 | * We do much better on cost than other Chinese suppliers, we produce battery lead plates by ourself; |
2 | * We never use recycle lead, all our lead plates use 99.997% pure new lead; |
3 | * We never use recycle plastic particles; |
4 | * Our Negative Plates: Use the special PbCa alloy grids, optimize the recombination efficiency and less gassing. |
5 | * Our High quality AGM separator: Absord acid electrolyte, the best retainer mat for VRLA batteries. |
6 | * Our Positive plates: PbCa grids minimize corrosion and prolong life. |
7 | * Our Terminal post: New Copper or lead material with maximum conductivity, enhance the high current rapidly. |
8 | * Our Vent Valve: Allows the release of the excess gas automatically for safety. |
9 | * Our Silicone GEL electrolyte: Import from Germany Evonick's Aerosil silicone. |
10 | * Our Three steps of Seal procedures: Ensure battery completely sealed with safety, never leakage and volatile acid, longer life. |
11 | * Delivery time: within 15 working days, if need urgent, we can ship for you within 10days. |
12 | * Offer OEM for free: which can help you enlarge your company profit. |
Payment
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment | |
FOB | ||||
CFR(CNF) | 30% T/T in advance, paid the balance against copy of B/L | |||
CIF | ||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | |||
Western Union | Amount Lower than 5000usd |